Powering Your Business with Solar Solutions.

Every company faces different energy challenges — rising electricity costs, increasing pressure to decarbonize, and the need for resilient, sustainable operations. At ITC ENEX, we offer comprehensive solar solutions designed to address these issues head-on. Whether your priority is zero upfront investment, flexible Contract terms, or maximizing ROI through asset ownership,

we provide three implementation models to meet your specific needs:

  • PPA (Power Purchase Agreement): Start with zero initial cost and pay only for the electricity you use.
  • Rental: Start with zero initial cost and Spread costs over time with a fixed monthly payment.
  • Self-Investment: Own the system outright for maximum financial return and operational freedom.

 

Our service covers system design, engineering, construction, operation, and maintenance, enabling you to transition to renewable energy with confidence and ease.

PPA

PPA (Power Purchase Agreement)

Start with zero initial cost and pay only for the electricity you use.

Rental

Rental

Start with zero initial cost and Spread costs over time with a fixed monthly payment.

Self Investment

Self-Investment

Own the system outright for maximum financial return and operational freedom..

Comparison of Installation Models

Item
PPA (Power Purchase Agreement)
Rental
Self-Investment
Initial Cost
0 THB
0 THB
High (Full Investment)
Contract Term
10–15 years
10–15 years
-
Equipment Ownership
ITC ENEX
ITC ENEX
Customer
Accounting Treatment
Off-balance (Depend on customer)
On-balance (Capitalized)
(Depend on customer)
On-balance (Capitalized)
Key Advantages
Zero initial cost, immediate cost savings
Fixed monthly payment, Zero initial cost, immediate cost savings
Maximum Return
Best For
Want to install solar power with no upfront cost and without recording it as an asset
Want to install solar power with no upfront cost
Want to maximize revenue

Detailed Explanation of Each Model

PPA (Power Purchase Agreement)

Overview: Start with zero initial cost and Spread costs over time with a fixed monthly payment.

Benefits:

  • 1. Need environmental measures
  • 2. Reduce CO₂ emissions by XX tons annually
  • 3. useful for CDP/ESG evaluations

Considerations: The customer does not need to invest in the initial cost of the system, but the customer needs to pay for the electricity used.

Best suited for: Companies that need to install solar power systems without investing in the initial cost of the system.

Rental

Overview: Start with zero initial cost and Spread costs over time with a fixed monthly payment.

Benefits:

  • 1. Need environmental measures
  • 2. Reduce CO₂ emissions by XX tons annually
  • 3. useful for CDP/ESG evaluations

Considerations: The customer does not need to invest in the initial cost of the system, but the customer needs to pay for the electricity used.

Best suited for: Companies that need to install solar power systems without investing in the initial cost of the system.

Self-Investment

Overview: Own the system outright for maximum financial return and operational freedom.

Benefits:

  • 1. Need environmental measures
  • 2. Reduce CO₂ emissions by XX tons annually
  • 3. useful for CDP/ESG evaluations

Considerations: The customer needs to invest in the initial cost of the system, but the customer can get the maximum financial return and operational freedom.

Best suited for: Companies that need to maximize revenue and operational freedom.

Project Implementation Process

① Proposal & Initial Consultation
Site assessment, current situation analysis, and initial solution proposal
~1–2 weeks
② Preliminary Estimate
Estimated generation output and cost-saving simulation
~1 week
③ On-site Survey
Roof condition, structural strength, solar irradiation assessment
~1 week
④ Detailed Design & Final Quotation
System design, equipment selection, final contract terms
~4–8 weeks
⑤ Contract Signing
Agreement on terms and signing of PPA or rental contract
~1–2 weeks
⑥ Installation & Commissioning
EPC work, system testing, and grid connection
~4–6 months
⑦ Operation Start
Power generation, monitoring, and O&M services begin

Post-Installation Support & O&M